Veegaland Amora is a single 21-storey tower by Veegaland Homes on Niravathu Road in Maradu, one of Kochi’s best-connected residential pockets. Just 78 apartments sit on 89.65 cents of land, in two types: 3 BHK homes from 1,789 to 2,104 sq ft and 3 BHK + study homes of about 2,493 sq ft.
The building is designed to stay cool and efficient, with Porotherm exterior walls, 25 kW of solar power for common areas, rainwater harvesting and EV charging in the parking. Residents get a swimming pool, gym, pickleball court, home theatre, co-working space and an air-conditioned games hall. P.S. Mission Hospital is about 170 m away, Forum Mall 1.5 km and Vyttila Metro 4.6 km.
Floor plans, price list and specifications, sent straight to your phone
Sources: Veegaland Developers official project page and the K-RERA register, November 2026. Details may change; confirm with our team.
Location, sizes, prices and RERA details at a glance. For the current price list and floor plans, ask our team.
Veegaland Amora is in Maradu, Ernakulam, Kochi. P.S. Mission Hospital is about 170 m away, Nucleus Mall 1.1 km, Forum Mall 1.5 km, Vyttila Metro 4.6 km, Infopark 12 km and Cochin International Airport 32 km.
Veegaland Amora has 3 BHK apartments from 1,789 to 2,105 sq ft and 3 BHK + study apartments of 2,493 sq ft.
Veegaland lists prices starting at ₹1.77 Cr*. Prices for the 3 BHK + study homes are on request and all prices are subject to change; ask for the current price list.
It is a single tower of Basement + Ground + 21 floors + terrace with 78 residences on 89.65 cents of land, developed by Veegaland Homes.
Yes. The project RERA number is K-RERA/PRJ/ERN/089/2026. You can check it at rera.kerala.gov.in.
Amenities include a co-working space, air-conditioned indoor games hall and guest bedrooms, swimming pool and kids’ pool, children’s play area, landscaped barbeque area, EV charging sockets, keyless digital locks and 25 kW solar power for common areas.
Use the enquiry form or call +91 95677 64589. Land on Earth, an authorised channel partner (K-RERA/AG/0036/2023), will share floor plans and arrange the visit.
The K-RERA registration lists 30 April 2031 as the proposed completion date.